Before[ Photo ]
After[ Photo ]
Full bathroom refit
TenterdenTired 90s suite stripped out, walls retiled, walk-in shower fitted. 8 working days.
Our Work
A selection of recent work. Photos taken on the job — we'll add new ones each month. (Owner: drop your own photos into these tiles when ready.)
Tired 90s suite stripped out, walls retiled, walk-in shower fitted. 8 working days.
Old back boiler removed, Worcester Bosch combi fitted, full system flush.
Floor-to-ceiling porcelain, new vanity, soft-close WC. Two-week job, on time.
Burst pipe behind a kitchen wall. Traced, isolated and repaired in one visit.
Annual service plus a full power flush — radiators back to running hot top to bottom.
Loft conversion ensuite from scratch — plumbing, tiling and extractor in 5 days.
Tell us about the job and we'll get you a fixed quote.